Structure:
RCC framework structure.
Doors:
Hard wood door frames, shutters in skin doors. Polished main door with all other doors painted. Locks of good brands such as Yale / Godrej / Equivalent shall be provided for main and bedroom doors.
Windows:
UPVC windows with 10 mm steel bar safety grills to be provided.
Flooring:
Vitrified tiles across all areas.
Kitchen:
Cooking platform in polished black granite. Glazed tile dado up to 2 feet above cooking platform . Stainless steel sink with drain board.
Utility:
Water and electrical points to be provided for washing machine and utensil cleaning area.
Lifts:
Passenger lift shall be separately provided for each block of apartments.
Water:
Bore-wells shall be provided with rain water harvesting facilities.
Sewerage:
Sewerage treatment plant of required capacity shall be provided
Electrical:
Concealed copper wiring of good quality shall be provided. Switches to be Anchor Roma or equivalent. ELCB and MCB shall be provided. TV point shall be provided in drawing room and master bedroom. Telephone point shall be provided in drawing hall.
Generator:
Generator shall be provided for all lifts and common areas. Each apartment shall be provided with backup power of 3 KVA.
Painting:
All walls shall be finished in plastic emulsion / wall paper. Grills to be painted with enamel paint.
Bathrooms:
Walls to have ceramic tiles dado to a height of 8'. Flooring shall be finished with non skid ceramic tiles. Good quality European closet with flush tank, basin with tap & shower unit shall be provided.