Structure:
RCC framed structure designed as per relevant BIS codes, structural efficient system implemented.
Plastering:
External walls: Waterproof sponge finish
Internal walls: Plaster of Paris punning work
Walls:
External walls with 6" solid blocks and internal walls with 4" solid blocks.
Doors/Windows:
Main door: Frame (6*3) of wood. Main door will be of 30 mm flush door with cladding on both sides paneled with teak veneer/membrane finished totally 40mm thick and polished if required.
All door/window frames (3*5) will be of wood, window shutters of honne wood/UPVC windows and flush doors of 30 mm with membrane finish on both sides for bedrooms and bathroom doors.
Hardware:
All hinges, handles, tower bolts, gate hooks, door stoppers, bedroom & toilet locks will be of stainless steel. Main door will be provided along with all necessary fittings.
Flooring:
Living/dining / bedrooms: Vitrified tiles flooring (2*2) of premium quality with skirting.
Kitchen: Ceramic anti-skid tiles with skirting all round.
Balcony: Anti-skid ceramic tiles.
Kitchen:
Kitchen platform with 20 mm granite top with bull nosing and stainless-steel sink with drain board, glazed tiles dado up to 2 ft height.
Plumbing:
For internal & external water lines, CPVC pipes will be used of make and all PVC pipes will be used of reputed brand. Each bathroom and kitchen will be provided with separate concealed valve for maintenance. Points in the bathrooms will be provided for diverters and overhead shower, hot & cold for wash basin, and points required for commode & health faucet & geyser point will be provided. Kitchen sink will be provided with hot & cold mixer. Provision for geyser & aqua guard. Utility area will be provided with points for washing vessels & washing machine.
Toilets:
Anti-skid ceramic tiles for flooring and glazed ceramic tiles dado up to 7 ft height for walls bifurcating dry and wet areas - all CP fittings will be of good make. All ceramic fittings will be of reputed brand or equivalent with wall hung closets with basins wherever possible. Sanitary lines in toilets and bathrooms will be through core cutting and not sunken slabs. False ceiling will be done.
Water Proofing:
Water proofing will be done for terrace area and for all bathrooms & utilities. Bathrooms will be chemically treated after water proofing.
Paintings:
Tractor emulsion for internal walls, apex for external walls, and enamel paint for doors, windows grills & railings externally. Internally all doors & windows will be polished.
Electrical:
Concealed copper wiring along with modular switches of reputed make. All rooms/living will be provided with AC, Wi-Fi and TV points & living will be provided with telephone point with adequate light, fan, geyser and power points.
Water:
Adequate usage of water supply through borewell, subject to availability and Corporation drinking water, large capacity sump tank and overhead tanks separate for borewell and Cauvery along with automatic water level controllers will be provided.
Common Area:
Staircase will be laid with solid flooring; M.S. fabricated railings will be provided. Intercom will be provided for each flat, common toilet for watchman and maids at parking level will be provided with a security room.
Lift:
4 persons automatic elevator of reputed make will be provided.
Disclaimer: The plans, specifications, and other details herein are only indicative. All Specifications are subject to change as per the Architects and Structural Engineers drawings and approvals.