Structure
Seismic-II zone compliant RCC framed structure/
Plaster
Internal walls: Smooth cement plastered with lime rendering.
External walls: Cement plastered with sponge finish
Painting
Internal walls & ceiling: Acrylic emulsion paint with roller finish
External walls: Exterior grade emulsion paint on texture surface.
Stair
Staircase flooring in marble.
Staircase handrail in S.S.
Doors & Windows
Main door: Engineered door frame with threshold having contemporary engineered flush shutter
Other doors: Engineered door frames with laminate-dressed engineered flush shutters.
Maid's room & maid’s toilet door: Painted flush shutter/aluminum frame shutter.
Door hardware: SS brush finish with Mortise lock.
Main door lock: Level 3 security Biometric door locks
Balcony railings: Toughened glass for safety
Windows: UPVC/ Aluminum sliding windows with mosquito mesh shutter.
Maid’s room window: Aluminum window
Flooring
Living/Dining/Kitchen: Imported marble
Second floor master suite: Wooden finish tile flooring/ laminated wooden flooring.
Balconies: Wood-finish tile flooring.
Terraces: Outdoor finish tiles.
Utility: Matt finished ceramic/vitrified tiles.
Maid’s room: Tile flooring, with ceramic tiles in toilet
Toilet Fittings & Accessories
Vitrified tile dado & flooring in master toilets
Ceramic glazed tile dado for wall up to the false-ceiling level in other toilets.
Soft close water closet of Roca/Kohler/Duravit/Toto or equivalent
Concealed cistern of Grohe /Kohler/ Gebrit in all toilets
Counter type/wall mounted wash basin(white) of Roca/ Kohler/ Duravit/Toto with basin mixer in all bathrooms.
Hot and cold mixer of Jaguar/Grohe/Kohler or equivalent makes in all bathrooms.
Rain Shower in the master toilet
Health faucet provided in all toilets.
False ceiling in toilets.
Maid's toilet fixtures
200 ltr. solar water heaters shall be provided and connected to all toilets.
Electrical
Exhaust fan in all toilets
Fire retardant electric wires of Havells/Lap/Finolex/RR/KEI or equivalent.
T.V and Telephone point in the living room and all bedrooms
Elegant designer modular switches of GM/Norisys/Abb/ Crabtree or equivalent.
Split AC power point in living room, dining room and all bedrooms.
Power supply: 4BHK-12 KW
Power Backup: 100% lighting load for villas (including refrigerator).
100% DG backup for lifts, pumps & common area lighting.
Intercom facility from security to each house.
CCTV cameras at security.
Colour video door phone at the main door.
Kitchen & Utilities
No granite platform shall be provided in the kitchen/utility
No tile dado in the kitchen.
Provision for water purifier, instant geyser & exhaust fan.
Provision for hob & chimney in kitchen.
Provision for refrigerator in kitchen.
Provision for washing machine & dishwasher
SS sink with drain board in utility
Plumbing
All internal concealed plumbing lines will be pressure tested.
All water supply lines are of CPVC/UPVC of reputed make.
All sanitary lines are of SWR grade PVC pipes