Wall finishing
Internal walls & ceiling finished with oil bound distemper .
External walls painted with weather coat/weather shield paints .
Flooring
Vitrified tiles for living/dining/kitchen & bedrooms.
Ceramic tiles for balconies and utility areas.
Lobbies with rustic finish/vitrified tiles.
Doors & windows
Main doors with teak wood frames and teak finish flush doors.
Other doors with pine wood frames with moulded panel doors.
Three track powder coated aluminium windows.
Kitchen
Granite counter top with chrome plated tap with single bowl sink.
Cladding with ceramic tiles 2ft above the kitchen platform.
Toilets
Ceramic tiles for flooring and Dado upto 7ft height.
Granite counter with wash basin in the master toilet and wall mounted wash basins in other toilets.
EWC's and chrome plated fittings with shower mixer in all toilets.
Grid false ceiling.
Provision for exhaust fan and geysers.
Electrical
2 BHK & 2.5 BHK: 4KW BESCOM power single phase supply & 0.75 KW DG back up.
3 BHK: 5KW BESCOM power single phase supply & 7 KW DG back up.
700% DG back up for pumps, lifts and common areas.
Water supply
CPVC line for water supply.
UPVC/PVC lines for soil. drainage and external lines.
Sewage treatment plant.
Rain water harvesting system.
Lifts
8 passengers & 75 passengers lift in each wing.
Security system
Intercom facility provided.
CCTV coverage in peripheral areas.
Security cabin at entrance & exit.