Structure
Earthquake Resistant : Seismic Zone II complaint RCC framed structure as per IS 1893-2002
Block Masonry : Aerated Autoclaved Concrete (AAC) block Masonry - Aerocon Product
Clear height (height from floor to false ceiling) : 10'5" Clear Height
Plastering
Internal Walls : ll internal walls will be smoothly plastered with gypsum / POP punning to give even finish.
Cornices : False ceiling will be provided as required for concealing the AC FCUs. Other areas cornice are provided to hide sprinkler pipes.
Painting
Interiors : 2 coat Acrylic emulsion paint with roller finish.
Exteriors : Maintenance free texture paint or other equivalent solution.
Flooring
Living, Dining & Family : Natural Engineered Italian marble flooring.
Master Bedroom : Natural Engineered Italian marble flooring.
Other Bedrooms : Natural Engineered Italian marble flooring.
Kitchen : Natural Engineered Italian marble flooring.
Utility : Vitrified tile flooring matching the flooring in the interiors of the apartment.
Balcony : Vitrified tile flooring matching with the room flooring of the apartment.
Private Terrace : Combination of vitrified tiles, landscape and swimming pool as per architects design.
GF Lift Lobby : Designer ground floor lift lobby with Natural Engineered Italian marble flooring and cladding.
Other Floor Lift Lobbies : Natural Engineered Italian marble flooring and cladding.
Toilets
Master Bedroom : Natural Engineered Italian marble flooring.
Other Bedrooms : Natural Engineered Italian marble flooring.
EWC :White imported EWC in all toilets of Kohler make.
Wash Basin with Countertop : Natural Engineered Italian marble flooring counter top with White imported Wash Basin of kohler make.
Shower Cubicle : Provided in all toilets.
Hot/Cold Water Mixer : Single lever hot and cold water mixer unit for shower of Grohe make in all the toilets.
Health Faucet : To be provided in all toilets.
Master Control Cock Toilet : Master control cock for all the toilets.
flooring : Vitrified tile flooring
Toilet Ventilation : Provision for Exhaust.
Doors and Windows
Main Doors :
Frame : 8 feet high Engineered wood doorframe equivalent to wall thickness.
Shutter : 35mm thickVeneered Designer door shutter.
Main Door : Lacquar finish on both sides for main door.
Hardware : Premium quality German or Imported chrome finished hardware.
Other Doors & Windows :
Frame : 8 feet high Engineered wood doorframe equivalent to wall thickness.
Shutter : Designer engineered wood door shutters.
Toilet Door : Designer engineered wood door shutters.
Hardware : Good quality German/imported chrome finish hardware.
Railings : Glass Railing with SS Handrail.
Balcony Door : Living room and Bedrooms will be provided with UPVC / aluminium powder coated sliding doors for balcony.
Windows : UPVC / Powder coated aluminium sliding windows with tinted glass and provision for mosquito mesh.
Kitchen
Electrical & Plumbing Points :
Provision for electrical & plumbing points for modular / Island kitchen (granite platform with sink and drain board will be provided on request and at an extra cost).
Aquaguard : Provision given.
Washing Machine, Ironing in Utility :Provision given.
Pipes gas, through gas banks : Provided.
Electrical
TV Point : One TV point to be provided in each bedroom and living room.(Containment/Conduting for TV Point for all Bedrooms & Living upto TV Shaft).
Electrical Wires : Fire resistant electrical wires of R R Kabel make or equivalent.
Switches : Elegant designer modular electrical switches of reputed make.
MCB : One miniature circuit Breaker(MCB) for each circuit provided at the main distribution box within each flat.
ELCB : For safety, one Earth Leakage circuit Breaker(ELCB) will be provided for each flat.
Telephone Points : To be provided in all bedrooms, living room, family room and kitchen with provision for installing your own mini EPABX. (Containment/Conduting for Telephone Point for all Bedrooms & Living upto Telephone Shaft).
A/C Points : Entrance lobby at ground floor -will be air conditioned & above level lift lobbies will not be air conditioned .Club house will be centrally air-conditioned.
Power : 5 kW (3 Phase) for 3 / 3.5 /4 BHK, 6 kW (3 Phase) for 5BHK DUPLEX/ 3BHK PENT HOUSE/ 4BHK PENT HOUSE.
HT/LT Power : LT power
Security Systems
Security Personnel : Trained security personnel will patrolling the project round the clock.
CCTV Cameras : Complete coverage by CCTV cameras will be provided in the common areas and security gate.
Access Control Doors : Entry to the building will be restricted through access control doors at the ground floor.
Vehicle Entry/Exit : Entry of Vehicles to the project will be controlled with boom barriers and security screening for visitors.
Movement Sensors : Periphery of the compound will be protected by electrical Perimeter fence.
Water Treatment/Softening Plant : Treated water through an exclusive water purification / softening plant within the project will be provided