Structure:
RCC framed structure with concrete block masonry.
Walls:
External walls: 6" solid concrete blocks.
Internal walls: 4" solid concrete blocks.
Kitchen:
Granite platform with stainless steel sink.
4 feet glazed tiles dado above the platform.
Provisions for water purifier, exhaust chimney, and washing machine.
Lifts & Lobby:
Granite flooring in entrance lobby.
4 lifts with 8-passenger capacity.
Surface cladding for lift walls.
Plastering:
External walls: Two-coat sponge finishing with texture.
Internal walls: Smooth plastering with wall care putty.
Painting:
Interior walls: 3 coats of putty, 1 coat of primer, 2 coats of premium emulsion paint.
Exterior walls: 1 coat of white cement, 1 coat of primer, 2 coats of Apex paint.
Electrical:
Concealed wiring (Finolex or Anchor).
Adequate points for lights, fans, and other plugs.
Modular switches (Anchor or Roma).
TV points in the living room and master bedroom.
AC provision in the master bedroom.
Power connection: 3 KW for 2 BHK, 4 KW for 3 BHK.
Flooring:
Vitrified tiles for living, bedrooms, kitchen, and dining.
Anti-skid tiles for toilets and balconies.
Granite flooring for corridor, staircase, and foyer.
Generator Backup:
DG power backup for lighting points, fans, and TV points.
Additional backup for lift, water pump, and common areas.
Water Supply:
Adequate supply through bore well.
Provision for Cauvery water in the kitchen.
Facilities:
Sewage Treatment Plant.
Rainwater harvesting pits.
Doors & Windows:
Main door: Teak wood frame and shutter.
Internal doors: Sal wood frame with designer skin moulded shutters.
3-track UPVC windows with mosquito mesh and MS safety grills.
Toilet:
Anti-skid tiles for flooring.
Glazed ceramic tiles up to 7 feet wall cladding.
Concealed plumbing lines with CP fittings (Jaquar) and sanitary ware (Hindware).
Provision for exhaust fans and geysers.
Security:
CCTV camera surveillance.
Intercom connection to the security office.