Structure
RCC Frame structure with columns Beams and Slabs
Walls
Cement solid blocks for external walls.
4” Cement Solid blocks for internal walls
Plastering
All internal walls are smoothly plastered with lime rendering finish.
All external walls are finished with sponge.
Main Door and Door Frame
Ghana Teakwood frame for main entrance door.
Teak Veneer (OST) shutters for main door.
Teakwood polish outside (corridor side) and enamel paint inside for main door.
Good quality Brass/ Chromium fittings.
Security Eye for main door.
Other Doors and Door Frames
Sal wood Frames for other doors.
Flush shutters for doors.
Enamel Paint with primer and putty for both sides.
Powder coated hardware fittings for doors.
Windows
Three (3) Track powder coated aluminium frames for all windows.
Mosquito mesh provision for all windows.
Safety iron grills for all windows.
Either Glazed tinted or transparent glass.
Powder coated aluminum frames with tinted glass windows for all the toilets.
Toilets
Anti-skid ceramic tiles flooring.
12’*8’ Glazed tile dado up to 7 Feet height.
15 Amps power supply for each toilet for geyser provision.
Exhaust fan provision for each toilet.
Sanitary Ware
European W.C with plastic flush tank will be provided.
Cello type of wash basin will be provided.
Hind ware quality of sanitary will be provided.
C.P. Fittings
Jaguar (continental)/ESS/MARC or equivalent to that of C.P fittings will be provided.
2 in 1 external wall mixer (Hot & Cold) with overhead shower (O.H.S) will be given.
Provision for Exhaust fan will be provided.
15 Amps plug point provision for Geyser fitting.
PVC or CPVC pipes will be used.
Corridor & Staircase
Granite flooring will be provided at the corridor and staircase.
Flooring
23” * 23” size vitrified floor tiles for Hall, Dining and both the bed rooms.
12” * 12” size anti-skid or Matt finish tiles for kitchen and Balconies.
Electrical Work & Power Supply
Copper coring (fire Resistant Electrical wire).
Modular Switches of ISI Standard.
For safety, one earth leakage circuit breaker (ELCB) for each unit.
3 KVA capacity of power for each Apartment.
Paint & Polish
Two coats of OBD/Emulsion paint for internal wall.
Two coats of Putty.
One coat of Primer.
Good quality of Enamel paint for all door frames, shutters and window steel grills.
Exterior emulsion paint for external surface.
Kitchen
Two coats of OBD/Emulsion paint for internal wall.
Two coats of Putty.
One coat of Primer.
Good quality of Enamel paint for all door frames, shutters and window steel grills.
Exterior emulsion paint for external surface.
Terrace
Water proof course of floor plastering.
Telephone Points
Individual Telephone points in Hall and the master bedroom.
Lift
One lift with (Johnson/ Otis / Kone / Surya or equaling to that of LIFT) of six passenger capacity will be provided.
Generator
Acoustically insulated stand by generator for lights in common area.
Adequate power back up (0.6 K.V.A) for each unit.