Structure
Seismic zone II compliant - RCC structure
Plastering
All internal walls smoothly finished and painted
Flooring
Good quality Vitrified tile flooring in living and dining of all flats
Laminated wooden flooring in the master bedroom and vitrified tiles flooring in other bedrooms
Vitrified tiles in the kitchen of all flats
Ceramic tiles in toilets, balconies and utility area.
Granite/marble flooring in the ground floor lift lobby and vitrified tiles in lift lobbies of all the floors
Toilets
Ceramic tile dado in all toilets
EWC and health faucet for all the toilets
Washbasin with granite countertop in all toilets except in common toilet
Toughened glass shower partition in master bedroom toilet only
Single lever shower mixer in all showers and single lever mixer for all washbasins
Doors
All doors are made of engineered wooden door frames and shutters
UPVC sliding doors with mosquito mesh for living to balcony and bedroom to balcony
Windows
UPVC sliding windows with mosquito mesh
Kitchen
Granite platform with stainless steel sink & drain board
2 ft. (0.6 m) dado above platform area with ceramic glazed tiles
Provision for water purifier in kitchen
Provision for washing machine in utility area
Painting/Polishing
Interior: plastic emulsion paint
Exterior: textured / acrylic emulsion paint
Enamel painting for MS grill/railings
Plumbing
Good quality CP fittings
Green rated; lead free PVC drainage & storm water pipes
Dual piping system - fresh water in shower/washbasin/toilet faucet/kitchen and recycled treated water for toilet flushes
Electrical
TV, telephone, networking and electrical AC points in all bedrooms & living area
Good quality electrical wires and switches
Provision for ceiling fan points in living, dining and all bedrooms
Connected power load 2 BHK - 5 kw and 3 BHK - 6 kw
100% power backup of allocated power with DG capacity arrived at a diversity factor of 2.0
Lift
2+1 - Passenger and Service lift in the building
Telephone and Network
FTTH - fibre to the home - data & voice connection
Internal telephone cabling/wiring in all apartments
Safety and Security
CCTV surveillance at access controlled entry, exit, lift lobbies, lifts and common areas
Project is designed to detect and fight the fire incidents as per National Building Code 2016
Others
Rainwater harvesting system as per municipal guidelines
Sewage treatment plant is provided and treated water is connected to all flushing cisterns
Piped gas up to utility of all flats