STRUCTURE:
Seismic zone II compliant RCC framed structure
Masonry walls with concrete block
PLASTERING:
All internal walls smoothly plastered.
External plastering with sponge finish.
FLOORING:
Good quality Vitrified tiles in living, dining, bedrooms & kitchen.
Ceramic tiles for toilets, balconies and utility area.
Granite Flooring in Ground floor Lift lobby and vitrified tiles in lift lobbies of all the floors.
Pre polished concrete step tiles for Staircase.
TOILETS:
Good quality Ceramic tile dado upto 7 feet (2.15m) height in all toilets.
EWC and Health faucet in all toilets.
Wash basin with granite counter top & mirror in all toilets except in common toilet & maid toilet.
Toughened glass shower partition with openable shutter in Master bedroom toilet only.
Single lever mixer with shower rail & hand shower for all showers and single lever mixer for all washbasins.
Provision for Geysers in all toilets.
Exhaust fan in all toilets.
EWC & water tap in maid toilet. (where applicable).
Ceramic tiles dado upto 4 feet height in maid toilet.
DOORS:
All doors with Engineered door frame & Moulded skin panel shutters.
UPVC sliding doors with mosquito mesh for Living to Balcony and Bedroom to Balcony.
WINDOWS:
UPVC sliding windows with mosquito mesh.
M.S grills (from inside) for windows in Ground & First floor only.
KITCHEN
Granite Platform with stainless steel sink & drain board with sink mixer.
Provision for dish washer in Utility.
2 feet (0.6m) dado above platform area with Ceramic glazed tiles.
Provision for water purifier point in kitchen.
Provision for Washing machine in utility area.
PAINTING / POLISHING:
Interior: Plastic Emulsion Paint.
Exterior: Acrylic Emulsion Paint.
Enamel painting for MS grill / Railings.
PLUMBING:
Good quality PVC Drainage & Storm water pipes.
Dual piping system - Fresh water in shower/washbasin/toilet faucet/kitchen and recycled treated water for toilet flushes.
Water meter for all the flats.
ELECTRICAL:
TV, telephone, networking and electrical AC points in all bedrooms & living area.
Two Earth Leakage Circuit Breaker (ELCB) for each Flat. (One for AC & heating and the other for lighting).
Good Quality Electrical Wires and Switches.
Provision for Ceiling fan points in living/dining and all bedrooms.
Connected Power load 2BHK – 5KW and 3BHK – 6KW.
Power back-up of allocated power with 50% diversity factor.
Meter for both BESCOM and DG.
LIFT:
Three lifts including One fire lift for each block.
TELEPHONE AND NETWORK:
FTTH - Fiber to the home - Data & Voice with internal cabling.
Internal Telephone cabling/wiring in all apartments.
SAFETY AND SECURITY:
CCTV surveillance for common areas and Access Controlled Entry & Exit.
OTHERS:
Sewage treatment plant is provided and treated water is connected to all flushing cisterns.
Piped Gas up to utility for all flats.