STRUCTURE:
»Seismic zone II compliant RCC structure
»Masonry walls with 8” /6”/4” Cement concrete Blocks.
PLASTERING:
»All internal walls plastered smoothly.
FLOORING:
»Laminated wooden flooring in Master bedroom only.
»Good quality Vitrified Tiles for Living, Dining, Kitchen & other bedroom
»Good quality Ceramic Tiles for Balconies, Utility area & Toilets.
»Good quality Vitrified Tiles for Lift Lobbies & Corridors.
»Cement Concrete Tiles for Staircase.
TOILETS:
»Good quality Ceramic tile dodo in all Toilets.
»White color wall mounted EWC & washbasin.
»Health faucet in all toilets.
»Geyser point provision in all Toilets.
»False Ceiling in all Toilets.
DOORS:
»All doors with engineered door frame & Flush door shutter with laminate.
»UPVC sliding doors with Mosquito mesh provision for Living room to Balcony.
WINDOWS:
»UPVC sliding windows with Mosquito mesh provision.
»UPVC ventilators with fixed louvers in Toilets.
KITCHEN:
»2 feet dado with Ceramic glazed tiles.
»Provision for water purifier point in Kitchen.
»Provision for gas Connection point in Kitchen.
»Provision for Washing machine in Utility area/Kitchen.
PAINTING / POLISHING:
»Interior: Oil Bound Distemper paint.
»Exterior: Texture Paint.
»Enamel painting for MS Railings.
PLUMBING:
»Good quality CP Fittings.
»Good quality PVC Drainage & Storm water pipes.
»Dual piping for fresh water in shower/washbasin/toilet faucet/kitchen and recycled treated water for toilet flushes.
ELECTRICAL:
»TV, Telephone, Networking in Master bedroom & Living area.
»Electrical AC Points in all Bedrooms & Living Area.
»Exhaust fan in all Toilets.»Two Earth Leakage Circuit Breaker (ELCB) for each Flat. (One for AC & heating and the other for lighting).
»Individual metering for both BESCOM & DG power backup.
»Good Quality Electrical Wires and Switches.
»Provision for Ceiling fan in living and all bedrooms.
LIFT:
»Passenger & Service lift for each block
.
OTHERS:
»Fiber to the home (Data & Voice).
Internal Telephone cabling/wiring for all apartments.
CCTV surveillance for Basement & Ground Floor lift entry in every block.
»100% Power back-up for Lifts, Pumps and lighting in Common areas.
»Power backup for apartments at diversity factor of 0.4.»Organic Waste Converter.
RAIN WATER HARVESTING:
»Common Rain water harvesting system as per municipal guidelines.